Backlog Maintenance of 10km rural roads

Backlog Maintenance of 10km rural roads

The backlog maintenance of 10km rural road consists of 2 roads in Kontagora local government area of Niger State. The lits of roads include: Kontagora -Gangaren Sagi -3km Tungan Wawa – Madara (7km) The scope of work for the projects is a double coat surface...
Backlog Maintenance of 24 km rural roads

Backlog Maintenance of 24 km rural roads

The backlog maintenance of 24km rural road is being carried out along Luma – Shagunu road in Borgu Local Government area of Niger State. The scope of work is double coat surface dressing with percentage completion of...
Backlog Maintenance 47.3km rural roads

Backlog Maintenance 47.3km rural roads

The backlog maintenance of a 45km rural road consists of 3 roads in the Lavun and Katcha local government areas of Niger State. The list of roads include: Doko-Gaba -Sheshi(14.43km) Patishin-DankoMasallaci(10km) Kataeregi -Ebba (23km) The scope of work for the...